On the morning of August 10th, Chairman and General Manager Cheng Jianliang organized a safety meeting for outsourced workers and our company's installation personnel. At the meeting, Cheng summarized the risks associated with the installation of nylon equipment and thickening lines on Line 4 and put forward a series of clear requirements, as follows:
The key to thickening the line is high-altitude operation, and it is necessary to wear a safety helmet and safety rope correctly. If necessary, a protective net should be set up for protection; For high-altitude work areas with many holes, protective measures should be taken to prevent accidental falls.
During the spinning installation process, there are many welding operations. Before hot work, it is necessary to clean up the flammable and combustible materials around the operation area in advance, do a good job in isolating the layers, and equip with complete fire-fighting equipment. Strengthen the patrol inspection of the installation area.
Temporary electricity must strictly follow the formal operating procedures, and unauthorized connections are strictly prohibited. The lines and fuses must be kept intact. If there is a need for temporary electricity, contact the company's electrical person in charge and operate according to the specifications.
During lifting operations, it is necessary to maintain a high level of vigilance and constantly prevent object impact accidents caused by falls to ensure lifting safety.
In addition, the weather remains hot after the beginning of autumn, and the spinning and screw layers have high temperatures. It is necessary to effectively prevent heatstroke and provide sufficient heatstroke prevention materials in advance to ensure the health of the workers.
Mr. Cheng emphasized in the end that while ensuring safety and quality, we must make every effort to catch up with the schedule and complete equipment installation with quality and quantity guaranteed.